Protects Stoughton's wetlands, rivers, and open spaces. Reviews any construction projects near sensitive natural areas.
136 items across 10 meetings.
June 29, 2026 · agenda
📋 Proposed
Coming up June 29: proposed construction of a 10'x20' in-ground swimming pool with concrete patio (DEP 298-0941).
📍 20 Lawler Lane
🔄 Postponed
Coming up June 29: continued review of amended plan filing by Scitec Engineering for ORE Associates (DEP 298-0899).
📍 Turnpike Street (Map 96, Parcel 002)
🔄 Postponed
Coming up June 29: continued review of proposed outdoor grease trap, sewer ejector system, force main and site improvements (DEP 298-0940).
📍 99 Central Street (Map 90, Parcel 91)
🔄 Postponed
Coming up June 29: continued review of mitigation for deforestation in a regulated area (DEP 298-0938).
📍 11 Knob Hill Circle
🔄 Postponed
Coming up June 29: continued review of two building additions to a residential dwelling (DEP 298-0930).
📍 55 Highland Rock Drive
🔄 Postponed
Coming up June 29: continued review of Day Spring Chapel's new religious building, parking lot, and demolition plan (DEP 298-0939).
📍 1076 Central Street (Map 56, Parcels 23, 24, 25)
💬 Discussed
Coming up June 29: request for Conservation Commission stewardship of town-owned parcels 061-010 and 062-012.
📍 Atkinson Ave (Parcels 061-010, 062-012)
💬 Discussed
Coming up June 29: Nouria Energy's request for a final Certificate of Compliance (191-01).
📍 28 Dykeman Way
💬 Discussed
Coming up June 29: continued discussion of developing signs prohibiting ATVs.
💬 Discussed
Coming up June 29: discussion of developing a bike/walking trail along the railroad bed on Paul M. Goulston Conservation land and surrounding land.
📍 Paul M. Goulston Conservation land
💬 Discussed
Coming up June 29: discussion of summer meeting schedule.
💬 Discussed
Coming up June 29: discussion of a commemorative sign at Glen Echo.
📍 Glen Echo
💬 Discussed
Coming up June 29: discussion of maintenance and ongoing projects on Conservation Commission lands and trails.
📋 Proposed
Coming up June 29: designating an authorized signer for FY27 Conservation Commission invoices.
💬 Discussed
Coming up June 29: J.A.M. McNamara Services LLC for perimeter mowing of conservation land.
📋 Proposed
Approval of prior meeting minutes.
June 25, 2026 · agenda
📋 Proposed
Proposed 10'x20' in-ground pool with concrete patio at 20 Lawler Lane needs Conservation Commission approval due to proximity to regulated wetland area.
📍 20 Lawler Lane, Stoughton
🔄 Postponed
Amended filing by Scitec Engineering for ORE Associates on Turnpike Street continues to a future hearing.
📍 Turnpike Street, Map 96, Parcel 002
🔄 Postponed
Proposed outdoor grease trap, sewer ejector system, pump chamber, and force main at 99 Central Street (Map 90, Parcel 91) continued again.
📍 99 Central Street (Map 90, Parcel 91)
🔄 Postponed
Hearing on mitigation for deforestation in a regulated wetland buffer zone at 11 Knob Hill Circle continues.
📍 11 Knob Hill Circle
🔄 Postponed
Two residential additions proposed by JLK Holmgren for Baker Family 2015 Trust at 55 Highland Rock Drive continue to a future date.
📍 55 Highland Rock Drive
🔄 Postponed
Construction of a new religious facility building, parking lot, and associated demolition at 1076 Central Street (Map 56, Parcels 23–25) continues.
📍 1076 Central Street (Map 56, Parcels 23, 24, 25)
💬 Discussed
Commission to discuss taking stewardship of two town-owned parcels on Atkinson Ave for conservation purposes.
📍 Atkinson Avenue (Parcels 061-010 & 062-012)
📋 Proposed
Nouria Energy requests a Final Certificate of Compliance (191-01), signaling completion of wetlands permit conditions at 28 Dykeman Way.
📍 28 Dykeman Way
💬 Discussed
Ongoing discussion about installing signage prohibiting ATVs on conservation land.
💬 Discussed
Commission to discuss developing a bike and walking trail along the railroad bed on Paul M. Goulston Conservation Land and surrounding parcels.
📍 Paul M. Goulston Conservation Land
💬 Discussed
Commission will set its meeting schedule for summer months.
💬 Discussed
Discussion of installing a commemorative sign at Glen Echo conservation area.
📍 Glen Echo
💬 Discussed
General discussion of maintenance needs and ongoing projects across Commission-managed lands and trails.
📋 Proposed
Commission to designate an authorized signer for FY27 invoices.
📋 Proposed
Commission to address perimeter mowing services contract for conservation land with J.A.M. McNamara Services LLC.
📋 Proposed
Approval of May 22, 2025 meeting minutes.
• Status unclear
Meeting adjourned.
May 28, 2026 · agenda
📋 Proposed
Amended filing for Turnpike Street parcel; Scitec Engineering filing on behalf of ORE Associates — details of amendment not specified in agenda.
📍 Turnpike Street, Map 96, Parcel 002
🔄 Postponed
Continued hearing for proposed outdoor grease trap, sewer ejector/pump chamber, and sewer force main at 99 Central Street.
📍 99 Central Street (Map 90, Parcel 91)
🔄 Postponed
Continued hearing on mitigation of deforestation in a regulated wetland buffer area at 11 Knob Hill Circle.
📍 11 Knob Hill Circle
🔄 Postponed
Continued hearing for two building additions to a residential dwelling; filed by JLK Holmgren on behalf of Baker Family 2015 Trust.
📍 55 Highland Rock Drive
🔄 Postponed
Continued hearing for a proposed 2-story mixed-use building at the Stoughton Commerce Center site on Turnpike Street.
📍 1516–1540 Turnpike Street
📋 Proposed
Extension of the Order of Conditions for Ames Pond aquatic vegetation management through July 14, 2029.
📍 Ames Pond
📋 Proposed
Extension of the Order of Conditions for Harris Pond aquatic vegetation management through July 21, 2029.
📍 Harris Pond
💬 Discussed
Notice of Eversource decommissioning a gas main at the former New England Sinai Hospital site on York Street.
📍 250 York Street
💬 Discussed
Invasive vegetation management plan filed by Epsilon Associates in connection with the South Elementary School project.
📍 South Elementary School
💬 Discussed
Commission to discuss creating signage prohibiting ATVs on Conservation Commission lands.
💬 Discussed
Update on plans for a new bicycle and walking trail along Atkinson Avenue.
📍 Atkinson Avenue
💬 Discussed
Routine update on maintenance and ongoing projects across Commission-managed lands and trails.
📋 Proposed
Designating an authorized signer for Conservation Commission invoices in FY27.
📋 Proposed
Commission to appoint a representative to the Community Preservation Committee, which funds open space, historic preservation, and housing projects.
📋 Proposed
Approval of prior meeting minutes.
• Status unclear
Meeting adjournment.
May 7, 2026 · agenda
• Status unclear
Meeting opens in-person and virtually via Google Meet.
📋 Proposed
Northern Star Investment proposes an outdoor grease trap, sewer ejector/pump chamber, force main, and site improvements at 99 Central Street (Map 90, Parcel 91).
📍 99 Central Street (Assessors Map 90, Parcel 91)
🔄 Postponed
Continued hearing on the Town's Notice of Intent for construction of the new South Elementary School on Park Street parcels (Map 65 Lot 133, Map 76 Lots 6–9, Map 77 Lot 2).
📍 0 Park Street (Assessors Map 65 Lot 133, Map 76 Lots 6–9, Map 77 Lot 2)
🔄 Postponed
Continued hearing on mitigating unpermitted tree clearing in a wetlands-regulated area at 11 Knob Hill Circle.
📍 11 Knob Hill Circle
🔄 Postponed
Continued hearing on proposed additions to a home and installation of a new onsite sewage disposal system at 55 Highland Rock Drive.
📍 55 Highland Rock Drive
💬 Discussed
Commission will discuss/act on an enforcement letter issued for 1735 Central Street.
📍 1735 Central Street
📋 Proposed
Commission votes whether to add an ATV prohibition sign project to its official task list, including design and placement decisions for conservation lands.
💬 Discussed
Discussion of routine maintenance and ongoing projects on Commission-managed lands and trails.
• Status unclear
Routine financial/accounting review.
• Status unclear
Unspecified carry-over items from prior meetings.
• Status unclear
Unspecified new items raised at the meeting.
📋 Proposed
Approval of minutes from a prior meeting.
April 16, 2026 · agenda
📋 Proposed
Notice of Intent to mitigate deforestation and filling of wetland in a regulated area at 11 Knob Hill Circle (DEP 298-0938).
📍 11 Knob Hill Circle
🔄 Postponed
Continued hearing on a new religious facility, parking lot, and demolition plan at 1076 Central Street (Map 56, Parcels 23, 24, 25; DEP 298-0939).
📍 1076 Central Street
🔄 Postponed
Continued hearing on construction of the new South Elementary School at 0 Park Street (Map 65 Lot 133, Map 76 Lots 6-9, Map 77 Lot 2; DEP 298-0934).
📍 0 Park Street
🔄 Postponed
Continued hearing on two building additions to a residential dwelling at 55 Highland Rock Drive (DEP 298-0930).
📍 55 Highland Rock Drive
🔄 Postponed
Continued hearing on a proposed 2-story mixed-use building at 1516-1540 Turnpike Street by Stoughton Commerce Center, LLC (DEP 298-0937).
📍 1516-1540 Turnpike Street
💬 Discussed
Enforcement order over tree and vegetation removal in a regulated area near a protected wetland and riverfront at 321 Central Street.
📍 321 Central Street
📋 Proposed
Request for stewardship of open space parcels abutting conservation land at Map 61 Parcel 10 and Map 62 Parcel 12, Atkinson Avenue Extension.
📍 Atkinson Avenue Extension
📋 Proposed
Request to install warning signs at turtle migration and nesting crossings on Ames Pond Lake Drive, West Street.
📍 Ames Pond Lake Drive, West Street
📋 Proposed
Request for final Certificate of Compliance at 25 Ruggiero Way (DEP 298-0901).
📍 25 Ruggiero Way
💬 Discussed
Accounting item for $579.00 in wildlife crossing signs.
💰 $579.00
📋 Proposed
Approval of April 4, 2025 and April 24, 2025 minutes.
March 19, 2026 · agenda
📋 Proposed
New hearing on a wetlands permit (Notice of Intent) for construction of a new religious facility building, parking lot, and associated demolition at 1076 Central Street (Map 56, Parcels 23–25).
📍 1076 Central Street, Assessors Map 56, Parcels 23, 24, 25
🔄 Postponed
Continued wetlands permit hearing for construction of Stoughton's new South Elementary School at 0 Park Street (Map 65 Lot 133, Map 76 Lots 6–9, Map 77 Lot 2).
📍 0 Park Street, multiple assessors parcels
🔄 Postponed
Continued wetlands permit hearing for 73 Crescent Avenue; no project details provided in the agenda.
📍 73 Crescent Avenue
🔄 Postponed
Continued wetlands permit hearing for a proposed 2-story mixed-use building by Stoughton Commerce Center, LLC at 1516–1540 Turnpike Street.
📍 1516–1540 Turnpike Street
📋 Proposed
McCormack Builders requests a Final Certificate of Compliance (confirmation all wetlands conditions were met) for work at 1922 Washington Street.
📍 1922 Washington Street
📋 Proposed
Zoppo Construction requests a Final Certificate of Compliance for completed work at 1150 Turnpike Street.
📍 1150 Turnpike Street
📋 Proposed
Skeleton Crew Builders, LLC requests a Final Certificate of Compliance for work at 213 Glen Echo Blvd.
📍 213 Glen Echo Blvd
💬 Discussed
Commission will discuss Stoughton's Open Space and Recreation Plan, which guides conservation priorities and public recreation land use town-wide.
💬 Discussed
Commission will address unauthorized motorized vehicle access on conservation land at 1286 West Street.
📍 1286 West Street
💬 Discussed
Discussion of snow storage practices at 1098 Turnpike Street, likely involving proximity to wetlands or conservation areas.
📍 1098 Turnpike Street
💬 Discussed
Commission will discuss proposed amendments to the town's Wetland By-law, which governs development and activity near wetlands throughout Stoughton.
💬 Discussed
Routine updates on maintenance and ongoing projects for commission-managed lands and trails.
💬 Discussed
Routine financial accounting review.
📋 Proposed
Approval of prior meeting minutes.
• Status unclear
Meeting adjourned.
February 26, 2026 · agenda
📋 Proposed
Hearing on a proposed two-story mixed-use building by Stoughton Commerce Center, LLC, near wetlands, coming up Feb 26.
📍 1516-1540 Turnpike Street
🔄 Postponed
Continued wetlands review for construction of the new South Elementary School at 0 Park Street, coming up Feb 26.
📍 0 Park Street (Map 65 Lot 133, Map 76 Lots 6-9, Map 77 Lot 2)
💬 Discussed
Request to close out wetlands permitting at 1150 Turnpike Street.
📍 1150 Turnpike Street
💬 Discussed
Discussion of a wetlands violation notice issued for RK Plaza at 1334-1366 Park Street.
📍 1334-1366 Park Street
💬 Discussed
Discussion of proposed changes to the town's wetland protection by-law.
💬 Discussed
Update on maintenance and ongoing trail and conservation-land projects.
• Status unclear
Standing items with no specifics listed.
📋 Proposed
Approval of prior meeting minutes.
February 19, 2026 · agenda
📋 Proposed
Notice of Intent for redevelopment of a new 4-bedroom home with onsite sewage disposal at 73 Crescent Ave, filed by Andy Arustamyan of Radient Remodeling & Construction.
📍 73 Crescent Avenue, Stoughton
📋 Proposed
Notice of Intent for a new addition to an existing structure at 213 Glen Echo Boulevard, filed by Daniel Fernades, Skeleton Crew Builders.
📍 213 Glen Echo Boulevard, Stoughton
🔄 Postponed
Continued Notice of Intent for a new building, equipment parking, hardscape storage, and septic system at 1823 Washington Street, filed by Anthony Escoto, Exteriorscapes, Inc.
📍 1823 Washington Street, Stoughton
🔄 Postponed
Reconsideration hearing (continued) on a proposed detached accessory dwelling unit (ADU) at 38 Elizabeth Street, filed by ET Engineering on behalf of Richard Roach.
📍 38 Elizabeth Street, Stoughton
📋 Proposed
Notice of Intent for two building additions to a residential dwelling at 55 Highland Rock Drive, filed by Scott Rogers, JK Holmgren.
📍 55 Highland Rock Drive, Stoughton
💬 Discussed
Commission reviews Greenman-Pedersen Inc. (GPI) environmental and stormwater peer review reports for the new elementary school at the Line Lumber site on Park Street.
📍 Park Street (Line Lumber Site), Stoughton
📋 Proposed
Request to close out a wetlands Order of Conditions with a final Certificate of Compliance for the completed project at 25 Ruggiero Way.
📍 25 Ruggiero Way, Stoughton
📋 Proposed
Minor revision to an approved site plan at 271 Canton Street, filed by Strongpoint Engineering.
📍 271 Canton Street, Stoughton
📋 Proposed
Review of proposed subsurface soil boring locations at 338 Canton Street, filed by Greenseal Environmental.
📍 338 Canton Street, Stoughton
💬 Discussed
National Grid notified the Commission of proposed subsurface investigation work related to its U2 Line refurbishment project in Stoughton.
📍 Stoughton (U2 Line corridor)
📋 Proposed
Commission considers accepting 11 land parcels from the Johanna Gibson Estate along Deady Ave, Glen Road, Glen Echo Blvd, and several landlocked lots (Parcels 070-047, 070-049, 070-054, 070-056, 070-059, 070-060, 070-075, 070-081, 082-026, 082-123, 082-090).
📍 Deady Ave / Glen Road / Glen Echo Blvd, Stoughton
💬 Discussed
Commission receives a status update on an existing enforcement order at 11 Knob Hill Circle.
📍 11 Knob Hill Circle, Stoughton
💬 Discussed
Discussion of maintenance needs and ongoing projects on Commission-managed conservation lands and trails.
📋 Proposed
Approval of minutes from the April 3, 2025 meeting.
January 29, 2026 · agenda
📋 Proposed
Hearing on redevelopment of a new 4-bedroom dwelling with onsite sewage disposal facility (DEP 298-0935).
📍 73 Crescent Avenue
📋 Proposed
Hearing on a new addition near wetlands (DEP 298-0936).
📍 213 Glen Echo Boulevard
📋 Proposed
Hearing on new building, equipment parking, hardscape storage and septic system (DEP 298-0929).
📍 1823 Washington Street
🔄 Postponed
Reconsideration hearing on a proposed detached accessory dwelling unit for Richard Roach (DEP 298-0925).
📍 38 Elizabeth Street
📋 Proposed
Hearing on two building additions to a residential dwelling near wetlands (DEP 298-0930).
📍 55 Highland Rock Drive
💬 Discussed
Environmental and stormwater peer review by Greenman-Pedersen Inc. for the proposed new elementary school at the Park Street Line Lumber site (DEP 298-0934).
📍 Park Street (Line Lumber Site)
📋 Proposed
Request for final certificate of compliance (DEP 298-0901).
📍 25 Ruggiero Way
💬 Discussed
Minor revision to site plan submitted by Strongpoint Engineering (DEP 298-0920).
📍 271 Canton Street
💬 Discussed
Greenseal Environmental proposed soil boring locations (DEP 298-0918).
📍 338 Canton Street
💬 Discussed
Notification of proposed subsurface investigation work tied to National Grid's U2 Line asset condition refurbishment project in Stoughton.
📍 Stoughton
💬 Discussed
Eleven parcels off Deady Ave, Glen Road, and Glen Echo Blvd (including landlocked lots) proposed for donation to the Town of Stoughton.
📍 Deady Ave / Glen Road / Glen Echo Blvd
💬 Discussed
Status report on an existing enforcement order.
📍 11 Knob Hill Circle
💬 Discussed
Update on maintenance and ongoing trail projects.
• Status unclear
Standing items; no specifics listed.
📋 Proposed
Review of prior meeting minutes.
January 8, 2026 · agenda
📋 Proposed
Global Property Services seeks amended Order of Conditions for a new 2-story residential home on Lot 2 Pondview Lane near wetlands.
📍 Lot 2 Pondview Lane, Stoughton
🔄 Postponed
Continued hearing on Exteriorscapes Inc. proposal for a new building, equipment parking, hardscape storage, and septic system for Anthony Escoto.
📍 1823 Washington Street, Stoughton
🔄 Postponed
Continued hearing on a home addition for the Baker Family 2015 Trust, filed by JK Holmgren.
📍 55 Highland Rock Drive, Stoughton
🔄 Postponed
Continued reconsideration of a prior vote on a proposed detached accessory dwelling unit (ADU) for Richard Roach, filed by ET Engineering.
📍 38 Elizabeth Street, Stoughton
💬 Discussed
Commission reviews a revised plan for a new single-family home on Lot 3 Silver Glen Road, submitted by High Point Engineering for Attitash Custom Home Design.
📍 Lot 3 Silver Glen Road, Stoughton
💬 Discussed
Commission to discuss a notice of violations issued for 23 Alderwood Rd.
📍 23 Alderwood Road, Stoughton
💬 Discussed
Commission to discuss a notice of violations issued against Platinum Auto Sales at 1873 Washington St.
📍 1873 Washington Street, Stoughton
💬 Discussed
Commission considers a task order from Greenman-Pederson, Inc. related to South Elementary School.
📍 South Elementary School, Stoughton
💬 Discussed
Commission discusses a proposed $160,000 three-year lake management program.
💰 $160,000 over 3 years
💬 Discussed
Discussion of maintenance and ongoing projects on Commission-managed lands and trails.
📋 Proposed
Approval of minutes from the March 13, 2025 meeting.
• Status unclear
Meeting adjourned.