MedfieldArchive › Zoning Board (ZBA)

Zoning Board (ZBA)

Grants exceptions to local zoning rules — for example, allowing a building that's slightly too close to a property line. Their decisions can be appealed to court within 20 days.

76 items across 20 meetings.

June 18, 2026 · agenda
• Status unclear
Routine opening of meeting.
🔄 Postponed
Continued hearing on a 40B (affordable-housing law) application to build 45 age-restricted affordable rental units on a vacant portion of the Medfield Housing Authority's Tilden Village property; continuance from 06/03/26.
📍 30 Pound Street, Assessors' Map 43, Lot 077
🔄 Postponed
Related application to amend the MHA's existing comprehensive permit to carve out the 2.54±-acre parcel proposed for the Rosebay development, per 760 CMR 56.07(4).
📍 30 Pound Street
📋 Proposed
Approval of minutes from the June 1 site visit and June 3 hearing.
June 16, 2026 · agenda
📋 Proposed
Owner Teresa James is asking the ZBA for a Finding and/or Special Permit (a specific approval required under zoning law for certain uses), and possibly a variance (an exception to zoning rules), to convert an existing pre-existing garage/barn into a single-story, handicapped-accessible Accessory Dwelling Unit (ADU) with approximately 1,160 sq ft of living space. The property at 67 Harding St is in the RT Zoning District and is partially within both a Primary Aquifer Protection District and a flood zone (Assessors' Map 56, Lot 007). Neighbors of this property and anyone concerned about ADU development near sensitive environmental areas should attend or tune in before the board votes.
📍 67 Harding St, Medfield, MA (Assessors' Map 56, Lot 007)
📋 Proposed
The board will review and vote to approve the meeting minutes from its February 25, 2026 session. This is a routine administrative action with no direct impact on residents.
June 10, 2026 · agenda
📋 Proposed
The owners of 301 North St want to tear down an existing nonconforming deck and replace it with a new 20-foot by 25-foot enclosed addition plus a smaller attached deck. Because the addition would push closer to the rear property line than allowed, the owners are asking the ZBA for a special permit and/or a variance (an exception to zoning rules). The required rear setback (minimum distance from the back of a structure to the property line) is 50 feet; it currently sits at 49 feet, and the proposed addition would bring it down to just 39 feet. Separately, lot coverage (the percentage of the lot covered by structures) would actually decrease slightly from 15.8% to 15.3%, though the allowed maximum is 15% — meaning it remains over the limit. The property is in the RT Zoning District and a partial Secondary Aquifer Protection District, shown on Assessors' Map 73, Lot 037.
📍 301 North St, Assessors' Map 73, Lot 037
📋 Proposed
The board will review and approve the meeting minutes from its February 25, 2026 session. This is a routine administrative action to formally adopt the record of a prior meeting.
June 3, 2026 · agenda
🔄 Postponed
The Rosebay at Medfield Limited Partnership is seeking a Comprehensive Permit under Massachusetts Chapter 40B (a state law that lets developers bypass some local zoning rules when a portion of units are affordable) to build 45 age-restricted affordable rental apartments on a vacant 2.54-acre parcel at the Medfield Housing Authority's Tilden Village property at 30 Pound Street (Assessors' Map 43, Lot 077, RU Zoning District with Secondary Aquifer Overlay). The project includes driveways, parking, landscaping, utilities, and stormwater management. The Medfield Housing Authority is also separately asking to modify its existing 1974 comprehensive permit (Decision #248) to carve out the 2.54-acre portion for this new development. This is a continuance from hearings on 12/04/25, 01/29/26, 03/12/26, 04/16/26, and a 06/01/26 site visit.
📍 30 Pound Street, Assessors' Map 43, Lot 077
📋 Proposed
The Board will review and vote to approve the minutes from its April 16, 2026 meeting. This is a routine administrative action.
June 1, 2026 · agenda
📋 Proposed
The ZBA will visit 30 Pound Street at 9:00 am on June 1, 2026 so board members can familiarize themselves with the property involved in the Rosebay 40B application. Board members may ask questions through the Chair and the applicant may point out site details such as boundaries, driveways, and proposed buffers. No testimony will be taken and no other discussion will occur at the site visit.
📍 30 Pound St, Medfield, MA
🔄 Postponed
The ZBA will continue hearing this application from Rosebay at Medfield Limited Partnership for a Comprehensive Permit under MGL Chapter 40B (a state law that allows developers to bypass local zoning to build affordable housing) to construct 45 age-restricted affordable rental units on a vacant 2.54+/- acre portion of the Medfield Housing Authority's Tilden Village property at 30 Pound Street (Assessors' Map 43, Lot 077, RU Zoning District with Secondary Aquifer Overlay). The development would include driveways, parking, landscaping, utility systems, and stormwater management. This is a continuance from hearings held on 12/04/25, 01/29/26, 03/12/26, and 04/16/26.
📍 30 Pound St, Medfield, MA; Assessors' Map 43, Lot 077
🔄 Postponed
Separate from but related to the Rosebay application, the Medfield Housing Authority is seeking to modify its existing comprehensive permit (originally issued in 1974 as Decision #248) to carve out the approximately 2.54-acre portion of Tilden Village that is proposed for the Rosebay development. This application is filed under 760 CMR 56.07(4), which governs substantial changes to existing comprehensive permits. This item is also a continuance from prior hearings.
📍 30 Pound St, Medfield, MA; Assessors' Map 43, Lot 077
April 29, 2026 · minutes
✅ Approved
The Board approved a special permit allowing JPMorgan Chase to build a new 3,293 square-foot bank building in Shaw's Plaza, even though it reduces parking below what zoning normally requires. The plan drops total parking from 409 to 374 spaces, with the option to go as low as 370 if the Fire Chief needs minor layout changes for emergency vehicle access. Parking studies showed peak demand of about 233 cars (57% of current capacity), so the Board found the reduced parking adequate. Conditions include a ban on snow storage in parking spaces (must be cleared within 24 hours), a prohibition on bank-only reserved parking, and a required construction management plan.
📍 230 Main Street (Shaw's Plaza), Assessors' map 51 lot 058
✅ Approved
The Board reviewed and approved the minutes from its March 25, 2026 meeting with no changes. The vote was unanimous, 3-0.
💬 Discussed
The Director reminded members to attend Town Meeting and noted upcoming business. A June 10 meeting is tentative pending member availability, and an amendment to a cluster subdivision at 15 Bridlefield will return for the Board's review.
📍 15 Bridlefield
April 29, 2026 · agenda
🔄 Postponed
JPMorgan Chase is asking the ZBA for a Finding, Special Permit, and/or variance (an exception to zoning rules) to build a new approximately 3,293-square-foot bank branch in the Shaw's Plaza parking lot at 230 Main Street. The project would reduce the number of parking spaces below the minimum required by Medfield's zoning rules, and includes sidewalks, landscaping, stormwater management, and ADA parking updates. This is a continuation of hearings that began on February 4, 2026 and has been heard again on March 4 and March 25, 2026.
📍 230 Main Street, Shaw's Plaza, Assessors' Map 51, Lot 058
📋 Proposed
The board will review and approve the administrative minutes from its March 25, 2026 meeting. This is a routine housekeeping item with no substantive decisions involved.
April 16, 2026 · minutes
🔄 Postponed
This is the fourth hearing session on a proposal to build 45 age-restricted affordable rental apartments on a 2.54-acre vacant portion of the Medfield Housing Authority's Tilden Village property at 30 Pound Street (Assessors' Map 43, Lot 077). The applicant gave verbal updates on plan changes worked out with Town departments and neighbors, but revised plans had not yet been submitted, so no updated drawings were reviewed. The Board did not vote on the permit itself at this meeting.
📍 30 Pound Street (vacant portion of Tilden Village), Assessors' Map 43, Lot 077
💬 Discussed
The applicant agreed to update plans to accommodate the Town's longest fire truck, add turning-movement analysis, relocate a fire hydrant for easier access, add a fire lane and no-parking signs, and install a Knox Box (a secure key box for emergency responders). The Fire Chief must confirm in writing that the revised plans are acceptable.
📍 30 Pound Street
💬 Discussed
DPW confirmed it is comfortable with separate domestic, fire, and hydrant water connections and said there are no capacity issues. After discussion, DPW and the applicant agreed a six-inch sewer connection (rather than eight-inch) is appropriate. Stormwater was redesigned so there would be no discharge into the Town system, pending DPW confirmation.
📍 30 Pound Street
💬 Discussed
The applicant plans to eliminate a stormwater basin at the rear of the property and replace it with larger underground stormwater chambers, leaving one basin behind Tilden Village. DPW also asked the applicant to explore an underground infiltration system to treat existing runoff passing through the site, which may not be feasible due to groundwater levels. Tetra Tech, the Town's peer reviewer, needs about three weeks to review revised plans.
📍 30 Pound Street
💬 Discussed
The applicant agreed to move the walking path closer to the abutting property line, relocate the playground (tot lot) to the far side of the path, remove a sidewalk connecting the project to the school, and shift a crosswalk closer to the student entrance and daycare. A continuous six-foot vinyl-coated chain-link fence with a Knox Box emergency gate and no-trespassing signs will be installed to direct students away from the emergency access and toward the walking path. A small designated smoking area will be created to keep smoking off school grounds.
📍 30 Pound Street (adjacent to school property)
💬 Discussed
Based on a letter from the Kavanaugh family, the Chair asked the applicant to consider relocating the entrance driveway closer to the Tilden Village side because the current location sits opposite a shared driveway where many children walk. The applicant explained the current location was chosen to minimize impact on single-family homes and noted a utility pole complicates relocation, but agreed to provide a sketch and aerial exhibit for comparison.
📍 30 Pound Street (Pound Street entrance)
💬 Discussed
Residents, including Select Board member Eileen Murphy, raised concerns that the building's design resembles 'The Parc' and may not fit the historic character of Pound Street. The applicant said the design had been revised three times with input from an ad hoc committee and that materials and detailing differ, but would need specific direction before another major redesign.
📍 30 Pound Street
💬 Discussed
The applicant plans Green Giant arborvitae screening between the walking path and parking, and will try to keep mature shade trees along Pound Street while removing invasive species. Residents asked how many existing trees would remain and requested pollinator-friendly species like linden trees. A full landscape plan will be provided, possibly as a condition of approval rather than before the hearing closes.
📍 30 Pound Street
💬 Discussed
The Board requested more detail on snow storage and removal, including effects on traffic flow, sight lines, parking areas, and extreme snow events. The applicant said this item is still in progress.
📍 30 Pound Street
🗳️ Voted on
The Board voted 3-0 to schedule a site visit for June 1, 2026 at 9:00 a.m. and to continue the hearing to June 3, 2026 at 6:00 p.m. via Zoom, holding June 18 as a backup date. The applicant agreed to extend the hearing closing deadline to June 30, 2026 (beyond the 180-day deadline) and to file that extension in writing.
📍 30 Pound Street
✅ Approved
The Board voted 3-0 to approve the minutes of its March 12, 2026 meeting.
April 16, 2026 · agenda
🔄 Postponed
The Rosebay at Medfield Limited Partnership is seeking a Comprehensive Permit under MGL Chapter 40B (a state law that lets developers bypass some local zoning rules in exchange for providing affordable housing) to build 45 age-restricted affordable rental apartments on a vacant portion of the Medfield Housing Authority's Tilden Village property at 30 Pound Street. The project would include driveways, parking, landscaping, utilities, and stormwater management on 2.54+/- acres zoned RU with a Secondary Aquifer Overlay. This is a continuance of hearings previously held on 12/04/25, 01/29/26, and 03/12/26.
📍 30 Pound Street, Assessors' Map 43, Lot 077
🔄 Postponed
The Medfield Housing Authority is separately asking the ZBA to amend its existing 1974 comprehensive permit (Decision #248) to carve out the 2.54+/- acre parcel proposed for the Rosebay development. This modification is filed under 760 CMR 56.07(4) and is directly tied to the Rosebay 40B application above.
📍 30 Pound Street, Assessors' Map 43, Lot 077
📋 Proposed
The ZBA will vote to approve the minutes from its March 12, 2026 meeting. This is a routine administrative action.
March 25, 2026 · minutes
🔄 Postponed
This was the third ZBA hearing on Chase Bank's application to build a 3,293 sq ft bank branch at Shaw's Plaza, which would reduce the plaza's parking by a net 35 spaces below the already-below-minimum level. The Board requested a detailed, tenant-by-tenant parking breakdown (Shaw's, Blue Moon Bagel, Marshalls, Chipotle, Fitness Together, and the proposed bank) and comparison against both town zoning requirements and ITE industry standards. A member of the public (Jeff Hyman, 1 Metacomet St) raised concerns about construction disruption to parking during the build phase. The hearing was unanimously continued to April 29, 2026 at 6:00 PM via Zoom to allow the Planning Board's peer reviewer (Tetra Tech) to finish its review and for the applicant to submit the requested parking data.
📍 230 Main Street, Shaw's Plaza, Assessors' Map 51, Lot 058
💬 Discussed
The Fire Chief requested that two raised parking islands in front of the proposed Chase Bank building be replaced with striped (painted) islands to improve maneuverability for emergency vehicles. The applicant agreed and incorporated this change into the plan. No other material changes to the parking layout were made.
📍 230 Main Street, Shaw's Plaza
💬 Discussed
Board members and staff raised concerns about a bus observed parking at Shaw's Plaza during daytime hours, occupying multiple spaces. The Police Chief confirmed the bus company had been conducting pickups at the plaza, which is not authorized by the property owner. The Police Chief planned to follow up with the school resource officer coordinating with the bus company and provide an update to the Board and applicant.
📍 230 Main Street, Shaw's Plaza
✅ Approved
The Board reviewed and unanimously approved the minutes from its March 4, 2026 meeting with no corrections or comments. The minutes are now part of the official record.
💬 Discussed
Chair McNicholas disclosed he will be unavailable May 12 through May 29, 2026, and asked Member William McNiff to chair any May ZBA meeting. Land Use Director De La Fuente noted she is also scheduling hearings for April, June, and July for applicants who may file soon. No specific applications were identified.
March 25, 2026 · agenda
🔄 Postponed
JPMorgan Chase is asking the ZBA for a Special Permit, a Finding, and/or a variance (an exception to zoning rules) to build a new 3,293 square-foot Chase Bank branch in the Shaw's Plaza parking lot at 230 Main Street. The construction would reduce the number of parking spaces below the minimum already required by town zoning rules, and minor ADA parking changes are also proposed. This hearing is a continuation from February 4 and March 4, 2026 and will be held via Zoom on March 25 at 6:00 PM.
📍 230 Main Street (Shaw's Plaza), Assessors' Map 51, Lot 058, B Zoning District with Partial Secondary Aquifer Overlay
📋 Proposed
The ZBA will review and approve the meeting minutes from its March 4, 2026 session. This is a routine administrative item with no direct impact on residents.
March 12, 2026 · minutes
✅ Approved
The Board approved minutes from its prior 40B session, correcting references that had mistakenly called Paul Haverty 'Town Counsel' to the correct title of 'legal consultant to the Board.' The motion passed 3-0.
🔄 Postponed
The applicant, Rosebay at Medfield Limited Partnership, is seeking a Comprehensive Permit under Chapter 40B to build 45 age-restricted (62+) affordable rental units on a 2.54-acre vacant portion of the Medfield Housing Authority's Tilden Village property. The applicant's engineer presented site plans showing one driveway from Pound Street, a looped parking area, 58 initial parking spaces (1.3 per unit) plus 12 future 'land-banked' spaces, municipal water/sewer connections, underground stormwater infiltration systems, two surface detention basins, and an 8-foot vinyl privacy fence (which needs a waiver since the bylaw normally limits fences to 6 feet). Board members raised concerns about fire truck access, snow storage, basin safety near the children's walking path, and lighting spilling toward existing Tilden Village residents.
📍 30 Pound Street (Assessors' Map 43, Lot 077); RU Zoning District with Secondary Aquifer Overlay
💬 Discussed
The applicant's traffic engineer reported that updated crash data showed no significant issues, and that sight distances from the driveway (500 feet north, 422 feet south) exceeded the required 320 feet. Parking studies at Tilden Village and a comparable Rockland development (Lydia Square) suggested the 58 proposed spaces substantially exceed expected demand of roughly 40 spaces. The Town's peer reviewer (Tetra Tech) had a minor discrepancy in counting spaces (56 vs. 58) but raised no insufficient-parking concern; several residents disputed the Tilden Village comparison, arguing active seniors aged 62+ would drive more.
📍 Pound Street / South Street
💬 Discussed
Direct abutters and neighbors (Colin Leary, Stephanie Sinis, Eileen Murphy) raised concerns about the proposed 8-foot vinyl privacy fence, preservation of mature trees, lighting, and a heavily-used children's walking path that crosses the site. Several preferred no fence or a natural green buffer instead, and the applicant agreed to meet directly with the three most affected abutters to revisit fence type, path placement, and screening. The fence, path, and decorative stone wall were all features added years earlier at neighbors' requests and are not technically required.
📍 South Street, Village Way (abutting properties)
💬 Discussed
Resident Bill Jaques (5 Sanders Way) asked whether the new building could disrupt underground water flow and worsen existing basement/sump-pump problems in his neighborhood. The applicant's engineer explained that groundwater flows away from Sanders Way toward the school and that the development would not alter groundwater behavior affecting those homes. The revised stormwater design no longer discharges into the Town drainage system.
📍 Sanders Way
💬 Discussed
The applicant submitted the state's August 22, 2023 conditional approval letter from EOHLC and an extension running until December 31, 2028. The Board's legal consultant explained that the state agency's eligibility determination, including approval of the developer selection (RFP) process, is conclusive unless there is a substantial change, addressing concerns raised in the Select Board's December 9, 2025 letter.
📍 30 Pound Street
🔄 Postponed
The Board directed the applicant to consult promptly with the School Department, Police, Fire (regarding ladder truck access and a possible larger truck), DPW, the Council on Aging, and the affected abutters before the next hearing. The Board also agreed to schedule a site visit (likely in May) and voted 3-0 to continue the hearing to April 16, 2026 at 6:00 p.m. via Zoom.
📍 30 Pound Street
March 12, 2026 · agenda
🔄 Postponed
Coming up for discussion on March 12, 2026: Rosebay at Medfield Limited Partnership is seeking a Comprehensive Permit under state Chapter 40B (a law that allows developers to bypass some local zoning rules when a significant share of units are affordable) to build 45 age-restricted affordable rental apartments on a vacant portion of the Medfield Housing Authority's Tilden Village property at 30 Pound Street. The project would include driveways, parking, landscaping, utilities, and stormwater management. This is a continued hearing, previously heard on December 4, 2025 and January 29, 2026.
📍 30 Pound Street, Assessors' Map 43, Lot 077
🔄 Postponed
Coming up for discussion on March 12, 2026: The Medfield Housing Authority has filed a separate but related application to modify its existing comprehensive permit (originally issued July 22, 1974) by removing the approximately 2.54-acre portion of the Tilden Village property that would be used for the Rosebay development. This modification is required so the Rosebay applicant can proceed with its own permit for that parcel.
📍 30 Pound Street, Tilden Village
📋 Proposed
The ZBA will vote to approve the minutes from its January 29, 2026 meeting. This is a routine administrative action to create an official record of that prior meeting.
March 4, 2026 · minutes
🔄 Postponed
JPMorgan Chase is seeking a special permit (an exception to zoning rules) to build a new 3,293 sq ft bank branch at Shaw's Plaza, which would reduce the already below-minimum number of parking spaces further. The Board discussed snow management concerns — up to ~40 spaces could be temporarily lost during large storms on top of the ~39 spaces permanently removed by the project. The hearing was continued to March 25, 2026 at 6:00 p.m. via Zoom, pending additional information from the Planning Board's March 10 site visit and March 23 hearing.
📍 230 Main Street, Shaw's Plaza, Assessors' Map 51, Lot 058
💬 Discussed
Resident Jeffrey Hyman submitted a letter and spoke at the hearing expressing concern about the cumulative loss of parking at Shaw's Plaza. He estimated that the bank project could eliminate ~39 permanent spaces plus ~40 additional spaces seasonally due to snow storage, raising worries about impacts on existing businesses and customers. He asked the Board to clarify at what point the parking reduction would be too large to approve under the nine special permit criteria in the zoning bylaw.
📍 230 Main Street, Shaw's Plaza
✅ Approved
The Board voted 3-0 to approve the minutes from the February 4, 2026 meeting with one correction: member William McNiff had been incorrectly listed as an associate member and the title was revised accordingly.
March 4, 2026 · agenda
🔄 Postponed
JPMorgan Chase is asking the ZBA for a Special Permit, a Finding, and/or a variance (an exception to zoning rules) to build a new 3,293 square-foot Chase Bank building within Shaw's Plaza at 230 Main Street. The project would reduce the number of parking spaces on the site to below the minimum required by Medfield's zoning bylaws. The proposal also includes sidewalk improvements, landscaping, stormwater management, and ADA-compliant parking. This hearing is a continuation from the February 4, 2026 meeting.
📍 230 Main Street, Shaw's Plaza, Assessors' Map 51, Lot 058
📋 Proposed
The board will review and approve the minutes from its previous meeting on February 4, 2026. This is a routine administrative action.
February 25, 2026 · agenda
🔄 Postponed
The owner of 32 Farm Street is asking the ZBA for permission to have a rear yard setback of only 29.2 feet, well short of the 50-foot minimum required by zoning rules. They are seeking a Special Permit, a Finding (a determination that the change won't make a non-conforming property more non-conforming), or a Variance (an exception to zoning rules) — whichever applies. This hearing has already been continued multiple times from November 12, 2025, January 14, 2026, and January 21, 2026, and is coming up again for discussion on February 25, 2026.
📍 32 Farm Street, Assessor's Map 73, Lot 024, Residential Town (RT) Zoning District
📋 Proposed
The board will review and approve the official meeting minutes from its two most recent prior sessions. This is a routine administrative item. No public decision is expected beyond a vote to accept the minutes.
February 4, 2026 · minutes
🔄 Postponed
JPMorgan Chase wants to build a new 3,293-square-foot bank next to Chipotle at Shaw's Plaza, which would reduce total plaza parking from 409 to 374 spaces — below the 543 the bylaw technically requires. The applicant's traffic consultant said parking is heavily underused (peak demand was 233 cars on the Saturday before Thanksgiving, about 57%), so the supply is more than adequate. The Board did not decide and continued the hearing to March 4, 2026 to wait for the Planning Board's parallel site plan review.
📍 230 Main Street (Shaw's Plaza), Assessors' Map 51 Lot 058
💬 Discussed
The owner of the abutting 258 Main Street property plans to install a gate (with a KnoxBox for emergency access) on the cut-through driveway connecting the two properties. Because there are no recorded access rights, the Town cannot require the connection to stay open, so regular traffic between the sites will be cut off while emergency vehicles can still get through.
📍 258 Main Street / 230 Main Street
💬 Discussed
The Police Chief observed buses using the plaza as a pickup and drop-off point within the last month and is working with the School Resource Officer to identify the operator and stop the practice due to safety concerns. A resident suggested it may relate to summer camp or private school rather than Medfield Public Schools.
📍 Shaw's Plaza, 230 Main Street
✅ Approved
The Board approved minutes from its September 10 hearing, which covered a variance (a zoning exception) for a shed at 12 Adams and a separate matter at 12 Hilltop.
📍 12 Adams; 12 Hilltop
✅ Approved
The Board approved minutes from the final deliberation session on the 86 Plain Street comprehensive permit matter, concluding the Board's involvement with that project for now. A comprehensive permit is a streamlined approval used for affordable housing developments.
📍 86 Plain Street
📋 Proposed
The Planning Board is drafting a zoning change that would create a mixed-use overlay over downtown and Route 109 near Shaw's Plaza, allowing retail and housing together and permitting a second main building on a lot if it includes at least one housing unit. It would be administered through a Planning Board special permit and is headed to Town Meeting.
📍 Downtown Medfield and Route 109 near Shaw's Plaza
📋 Proposed
The Sign Advisory Board has requested bylaw changes setting numeric standards for externally illuminated signs to limit brightness and light spill onto public ways. The change is described as a proactive update as sign technology evolves and is expected at a mid-March public hearing.
📋 Proposed
Prompted by a citizen's petition from Christian Donner of 92 Green Street, the Town is proposing to allow home occupation signs on a building up to four square feet (up from one square foot) and to drop the rule limiting content to just name and occupation, while keeping freestanding signs to one square foot per face with no illumination. The petitioner agreed to withdraw his petition after the Planning Board agreed to fold the changes into the broader sign amendments for Town Meeting.
📍 92 Green Street
February 4, 2026 · agenda
📋 Proposed
JPMorgan Chase is asking the ZBA for a Special Permit, a Finding, and/or a variance (an exception to zoning rules) to build a new 3,293 square-foot Chase Bank branch in the Shaw's Plaza parking lot at 230 Main Street. The new building would further reduce the number of parking spaces below the minimum required by Medfield's Zoning Bylaw; minor ADA parking modifications are also proposed. The project includes sidewalks, landscaping, stormwater management, and utilities. This is coming up for discussion and possible vote on February 4, 2026.
📍 230 Main Street (Shaw's Plaza), Assessors' Map 51, Lot 058, B Zoning District with Partial Secondary Aquifer Overlay
📋 Proposed
The ZBA will review and approve its meeting minutes from September 10, 2025 and October 16, 2025. This is a routine administrative action. No public decisions are expected.
January 29, 2026 · minutes
💬 Discussed
The applicant's traffic engineer presented a study finding the 45-unit, age-62-and-over development would add only about 9 car trips in the morning peak hour and 11 in the evening, a 0.1%–0.4% increase, and proposed roughly 1.27 parking spaces per unit. The Board's independent peer reviewer (Tetra Tech) asked for more data, including updated crash analysis, sight-distance plans, speed studies, and a real-world parking analysis using data from the adjacent Tilden Village and a comparable property in Rockland. The intersection of Pound Street and South Street already operates at a poor level of service (LOS E/F) projected for 2032, but the consultant said this is due to background growth, not the project.
📍 30 Pound Street (Assessors' Map 43, Lot 077)
💬 Discussed
Neighbors raised concerns about heavy pedestrian activity during school drop-off/pickup and high vehicle speeds on Pound Street, which includes a 20-mph school zone. The applicant's engineer confirmed a stop sign will be installed at the development's access driveway and that a 48-hour weekday speed study (with a possible weekend day added) would be conducted to verify sight distances.
📍 Pound Street near Sanders Way
💬 Discussed
The project proposes 57 parking spaces plus 12 additional 'land-banked' spaces that could be added later if needed. A Sanders Way resident worried about cars overflowing onto neighborhood streets; the applicant said the goal is to keep all parking on-site and could impose per-car fees or caps if needed. The Board asked for real vehicle-registration and car-count data from comparable senior properties to verify the parking supply is sufficient.
💰 Possible fees for residents with additional vehicles (no amount specified) 📍 30 Pound Street
💬 Discussed
The Medfield Housing Authority is seeking to modify its 1974 comprehensive permit to carve out a 2.54-acre 'surplus' portion of the Tilden Village property so it can be ground-leased (for 99 years) to the Rosebay partnership for development. State agency EOHLC issued a conditional approval requiring the surplus land be used only for affordable housing. The Board discussed needing this conditional approval and clean copies of the 1974 decision added to the record, and possibly broadening the modification to cover a new side-yard setback issue created by the boundary line.
📍 30 Pound Street / Tilden Village
💬 Discussed
The Select Board submitted a December 9 letter requesting documentation of how the developer was selected, including the RFP, responses, and Housing Authority votes, given past concerns that helped derail an earlier 'Rosebay 1' application. The applicant clarified that a new RFP was issued in November 2021, reviewed by EOHLC, and received a single response. The Board's attorney advised that site control is the state agency's call, and the conditional approval letter documenting the RFP process would likely satisfy the record.
📍 30 Pound Street
✅ Approved
The Board voted 3-0 to continue the public hearing to Thursday, March 12, 2026, at 6:00 PM via Zoom, to allow time for additional traffic data collection and peer review. The next session will focus on site plan review, parking, stormwater, and continued traffic analysis. Residents were encouraged to submit written comments in advance.
✅ Approved
The Board voted 3-0 to approve the minutes from its December 4 meeting.
January 29, 2026 · agenda
🔄 Postponed
The Rosebay at Medfield Limited Partnership is asking the ZBA for a Chapter 40B comprehensive permit (a state law that lets developers bypass most local zoning requirements when a set share of units is affordable) to build 45 age-restricted affordable rental apartments on a vacant portion of the Medfield Housing Authority's Tilden Village property at 30 Pound Street. The project would also include driveways, parking, landscaping, utilities, and stormwater systems. This is a continuation of the hearing that started on December 4, 2025.
📍 30 Pound Street, Assessors' Map 43, Lot 077, RU Zoning District with Secondary Aquifer Overlay
🔄 Postponed
Separately but related to the Rosebay application, the Medfield Housing Authority is asking the ZBA to amend its own existing comprehensive permit (originally issued in 1974) to carve out the approximately 2.54-acre portion of its Tilden Village property that would be used for the Rosebay development. This procedural step is required under state regulations (760 CMR 56.07(4)) before the new 40B permit can move forward. This is also a continuation from December 4, 2025.
📍 30 Pound Street (2.54+/- acre portion), Assessors' Map 43, Lot 077
📋 Proposed
The ZBA will vote to approve the official minutes from its December 4, 2025 meeting. This is a routine administrative action to create a formal record of what was discussed and decided at that prior session.